FLORENCE SUITES



PROJECT UNDER CONSTRUCTION 2015-2017

F lorence Suites is a new elite residential complex under construction for the year-round living, which is situated on the famous Bulgarian resort - Sveti Vlas.

Being notable for elegant architecture and high level of comfort, «Florence Suites» will be worthy sequel of the well-known «Villa Florence» RC. Location of the complex is chosen for a good reason. Sveti Vlas is situated in a picturesque place between the Black Sea coast and the mountain forest. This combination makes the air on this resort really healthful.

Two four-storey buildings of «Florence Suites» are designed subject to the year-round living and they will have everything needed for comfortable living: centralized heating and air conditioning system, high-speed Internet, cable television, attentive personnel and many other things. The complex is designed for a small number of flats that guarantees comfort and calm repose for the dwellers.

When constructing and finishing «Florence Suites» RC, the up-to-date technologies and high quality materials corresponding to the strictest standards of the European Union are used.



The complex includes:

- open-air swimming pool for adults and children;
- fitness room;
- restaurant with the Bulgarian, European, and Asian cuisines;
- children playground;
- paid in-house parking and open-air car parking;
- comfortable lifts;
- summer pavilions to rest;
- beautiful and well-managed adjacent territory;
- twenty-four-hour security and video monitoring;
- low maintenance fee and small fee for heating.



Complex location:

- 5 minute walk to beach;
- 15 minute walk to yacht club;
- 5 minute walk to supermarket;
- 5 minute walk to sanatorium to cure respiratory tract diseases;
- 5 minute drive to Solnechny Bereg (Sunny Beach);
- 30 minute drive to Burgas airport.


The Company gives all of those people who wish an opportunity to take part in investment projects.
Investment into the exclusive facilities of the developer under construction guarantees payback and high profit.

Completion of the complex construction is planned for the midyear 2017.



MIG BUILDING INVEST